WorkSafeBC says a employee killed on the large Oakridge Park growth website in Vancouver final yr when a mould used for concrete fell 26 storeys ought to by no means have been capable of stand the place she was.
A report launched by the province’s employee security company says “a number of crucial security failures” are responsible for the dying of Yuridia Flores on the website in February 2024.

The accident resulted in about 1,700 staff being evacuated from the five-million-square-foot mission that could be a partnership between builders Westbank and QuadReal Property Group. It was amongst a collection of crane accidents in Vancouver final yr.
The report says CCTV footage revealed there have been “no efficient controls in place” and security protocols weren’t adopted, with staff usually underneath suspended hundreds and coming into areas that ought to have been off-limits as “floor management zones.”
“The bottom management zone is a chosen space sometimes recognized with boundaries and/or crimson hazard tape that staff and different individuals mustn’t enter,” the report says.

Get breaking Nationwide information
For information impacting Canada and all over the world, join breaking information alerts delivered on to you after they occur.
Flores was standing in what ought to have been a floor management zone, offering visitors management and recognizing, when she was struck by the 9.6-metre-long and six-metre-wide mould, the report launched Wednesday says.

The first contractor, EllisDon, mentioned in a press release that it will “without end be deeply saddened by the tragic lack of Yuridia Flores.”
“We’re firmly dedicated to offering a security tradition that stops important incidents from occurring sooner or later,” it mentioned, including that the corporate was reviewing the WorkSafeBC report, but it surely had “not but had the chance to current our place on these issues to WorkSafeBC.”
The report says Flores “had not obtained any coaching or instruction pertaining to floor management, visitors management or recognizing.”
The company says there was an absence of readability about which contractor was answerable for the management zones and that ambiguity “contributed considerably,” as no single employer took duty.
A lawyer for Newway Concrete Forming, the contractor that employed Flores, mentioned in a press release that it has already applied modifications to the way it carries out inspections and operates management zones.
“Newway is reviewing the content material of the investigation report to find out if there are different areas to handle. Newway is dedicated to making sure the well being and security of all staff on the websites the place it really works,” the assertion mentioned.
The report says that on the day of the accident, a number of staff have been pushing the mould because it was rigged to a crane as a part of the method to get it from Stage 26 to Stage 27 when it “all of the sudden accelerated out of the facet of the constructing,” falling on Flores.
The report says pins that have been a part of the system that related the mould to the crane gave method and a brake line was ineffective. It says the entrance a part of the rigging used hooks with security latches whereas the again portion featured a “hybrid connector meeting that was not permitted by the producer or knowledgeable engineer.”
EllisDon didn’t be certain that the hazards have been recognized or that the protection measures for crucial lifts and overhead work have been co-ordinated, exposing staff to severe dangers, the report says.
“EllisDon failed to make sure that there was ample planning, co-ordination, hazard identification, danger evaluation, coaching, and supervision for the crucial carry and overhead work on the day of the incident,” the report says.
It says the corporate additionally didn’t assessment insurance policies and procedures, together with these for spotters and floor management zones in the course of the hoisting and repositioning of the mould, “resulting in the event of unsafe circumstances.”
“The insufficient fulfilment of prime contractor tasks was a key contributing issue within the incident,” the report says.
This report by The Canadian Press was first printed March 12, 2025.