The Macdonald Bridge in Halifax is ready to endure a makeover that can span a lot of the subsequent two years — leading to a number of weekend closures all through the method.
The work, dubbed “Mission Lifespan,” will see seven a long time of paint stripped off the bridge’s two towers.
Steven Proctor, a spokesperson for Halifax Harbour Bridges, stated eradicating the amassed paint will permit for preservation and restore work to be executed to be able to hold the long-lasting construction working for an additional 50 years.
“They’ll wrap the tower in materials in order that not one of the materials that they chip off goes into the harbour, goes into visitors, goes below individuals’s automobiles,” Proctor stated, including that the bridge’s towers may have a unique look as soon as the mission will get underway on April 25.

Get breaking Nationwide information
For information impacting Canada and world wide, join breaking information alerts delivered on to you once they occur.
“Inside that factor it’ll be pressurized and all of the stuff might be sucked right into a sure place the place it may be collected and disposed of in an environmentally pleasant vogue.”
Proctor stated a platform might be constructed above the bridge’s strolling trails and roadways so work might be executed with out interfering with visitors.
On Thursday, Nova Scotia Premier Tim Houston stood by the provincial authorities’s choice to permit an organization headquartered in the USA to spearhead the mission. He stated there wasn’t a Canadian firm capable of do the work.
“The place it’s a public security challenge, if we’ve to make use of an American firm within the face of public security then we’ll have to do this, however we’ll all the time search for alternatives for Nova Scotian corporations or Canadians,” Houston stated.
The Macdonald Bridge might be closed the weekend of April 25 as work will get underway.
For extra on this story, watch the video above.
© 2025 International Information, a division of Corus Leisure Inc.
Source link