Ontario’s snow storage amenities are feeling the pressure as this winter’s record-breaking snowfalls proceed to place infrastructure to the check.
With cities nonetheless cleansing up after back-to-back snowstorms, areas like town of Waterloo are being pushed to their limits, with crews working extra time, stretching assets and elevating issues about find out how to deal with future snowstorms.
At present, Waterloo’s snow storage capability is over 60 per cent, with 30,000 cubic metres of snow already hauled away to designated websites, mentioned Bob Henderson, town’s transportation providers director.
Regardless of these efforts, there’s nonetheless a lot of snow left to be cleared and transported to storage amenities, that are rapidly filling up, he added.
“The amount of snow acquired this season was unprecedented,” Henderson instructed International Information.
“Town is responding by using all accessible assets, inside and contracted, 24-7.”

Metropolis officers are already assessing the necessity for extra snow storage amenities in case town faces the potential for extra snowstorms within the coming weeks.

Get breaking Nationwide information
For information impacting Canada and all over the world, join breaking information alerts delivered on to you after they occur.
“If one other vital snowstorm have been to happen, we would want to re-evaluate our capability and search for different choices,” a metropolis spokesperson added.
The municipality is getting ready contingency plans to make sure that snow elimination continues easily, however the quantity of snowfall offered this 12 months has change into a rising concern for future winter climate operations.
The scenario isn’t distinctive to Waterloo.
The Metropolis of Toronto, which projected nearly all of snow that fell final month could be cleared inside three weeks, is now approaching that deadline — and nonetheless has vital work left to do.
As of Wednesday, town has eliminated 13,999 hundreds over a seven-day interval.
“Snow elimination operations of this scale are usually not typical,” mentioned Barbara Grey, town’s basic supervisor for transportation providers.

With 5 snow storage amenities and 450 dump vehicles assigned to move snow, town is working across the clock to complete the job.
“Snow elimination is a fairly slow-moving operation. It requires our crews to gather the snow and transfer them to designated storage websites, which can take as much as three weeks,” Grey mentioned.
Whereas some progress has been made, there are nonetheless extra roads left to be accomplished.
With winter storms persevering with to drop heavy snow throughout the area, Toronto’s snow storage operations are underneath extra stress than ever.
“We haven’t seen a scenario like this since January 2022,” Grey mentioned in a press convention final week.
Source link